[1]
2026. Integrating Weighted Delay Index (WDI) with Dynamic Critical Path Analysis for Enhanced Delay Assessment in Construction Projects. Journal of Civil Engineering Researchers. 8, 1 (Mar. 2026), 47–60. DOI:https://doi.org/10.66224/JCER.8.1.47.